Economic Production Quantity Calculator
Calculate basic economic production quantity, production-run duration and modeled annual costs.
Open toolCalculate basic economic order quantity and annual ordering/holding costs from supplied inputs. Provide Annual demand (units/year), Cost per order, Annual holding cost per unit to compute results directly in your browser. EOQ = sqrt(2DS/H). Demand and cost parameters are supplied, stable and positive; the basic model assumes instant replenishment and no shortages, discounts or capacity restrictions. Relevant cost excludes purchase cost. Numeric output uses up to 12 significant digits; floating-point rounding can occur.
Enter the inputs, then select Calculate.
Result will appear here
The Economic Order Quantity Calculator evaluates Annual demand (units/year), Cost per order, Annual holding cost per unit in client-side JavaScript using the deterministic rule below and updates the output panel immediately without uploading data to a server.
Calculate basic economic order quantity and annual ordering/holding costs from supplied inputs.
EOQ = sqrt(2DS/H). Demand and cost parameters are supplied, stable and positive; the basic model assumes instant replenishment and no shortages, discounts or capacity restrictions. Relevant cost excludes purchase cost. Numeric output uses up to 12 significant digits; floating-point rounding can occur.
Review the input parameters, allowed value ranges, and worked reference cases for the Economic Order Quantity Calculator below before running your calculation.
| Parameter / Scenario | Default / Sample Value | Rule or Allowed Range | Output / Usage Note |
|---|---|---|---|
| Input: Annual demand (units/year) | 10000 | Range: 1e-09 to 1000000000.0 | Required workspace parameter |
| Input: Cost per order | 50 | Range: 1e-09 to 1000000000.0 | Required workspace parameter |
| Input: Annual holding cost per unit | 2 | Range: 1e-09 to 1000000000.0 | Required workspace parameter |
| Worked Case 1: Baseline run (Annual demand (units/year) = 10000) | Preloaded / test values | Calculate basic economic order quantity and annual ordering/holding costs from supplied inputs | Annual demand (units/year) = 10000; Cost per order = 50; Annual holding cost per unit = 2. Output excerpt: Economic order quantity: 707.106781187 units; Orders per year: 14.1421356237; Annual ordering cost: 707.106781187; Annual holding cost: 707.106781187. |
| Worked Case 2: Comparison scenario (economic order quantity calculation exampl) | Preloaded / test values | Calculate basic economic order quantity and annual ordering/holding costs from supplied inputs | Annual demand (units/year) = 100; Cost per order = 10; Annual holding cost per unit = 2. Output excerpt: Economic order quantity: 31.6227766017 units; Orders per year: 3.16227766017; Annual ordering cost: 31.6227766017; Annual holding cost: 31.6227766017. |
Follow these three steps to configure Annual demand (units/year), Cost per order, Annual holding cost per unit, verify unit and boundary rules, and export your Economic Order Quantity Calculator output.
Start with annual demand (units/year). Allowed range: 1e-09 to 1000000000.0.
EOQ = sqrt(2DS/H). Demand and cost parameters are supplied, stable and positive; the basic model assumes instant replenishment and no shortages, discounts or capacity restrictions. Relevant cost excludes purchase cost. Numeric output uses up to 12 significant digits; floating-point rounding can occur.
Select Calculate, check the labelled result, then use Copy result or Download result.txt.
These concrete scenarios illustrate how the Economic Order Quantity Calculator processes baseline inputs, comparison checks, and boundary constraints.
Annual demand (units/year) = 10000; Cost per order = 50; Annual holding cost per unit = 2. Output excerpt: Economic order quantity: 707.106781187 units; Orders per year: 14.1421356237; Annual ordering cost: 707.106781187; Annual holding cost: 707.106781187.
Annual demand (units/year) = 100; Cost per order = 10; Annual holding cost per unit = 2. Output excerpt: Economic order quantity: 31.6227766017 units; Orders per year: 3.16227766017; Annual ordering cost: 31.6227766017; Annual holding cost: 31.6227766017.
When solving for 'economic order quantity calculator', verify that Annual demand (units/year), Cost per order, Annual holding cost per unit use consistent units and stay within the documented scope: EOQ = sqrt(2DS/H). Demand and cost parameters are supplied, stable and positive; the basic model assumes instant replenishment and no shortages, discounts or capacity restrictions. Relevant cost excludes purchase cost. Numeric output uses up to 12 significant digits; floating-point rounding can occur.
The output panel reports the exact result derived from Annual demand (units/year), Cost per order, Annual holding cost per unit alongside any unit or formatting notes.
Every calculation follows the rule: Calculate basic economic order quantity and annual ordering/holding costs from supplied inputs. Because JavaScript uses IEEE 754 double-precision floating-point arithmetic, numeric outputs display up to 12 significant digits where applicable.
Always cross-check the displayed result against the scope note (EOQ = sqrt(2DS/H). Demand and cost parameters are supplied, stable and positive; the basic model assumes instant replenishment and no shortages, discounts or capacity restrictions. Relevant cost excludes purchase cost. Numeric output uses up to 12 significant digits; floating-point rounding can occur) before applying the value to production specifications, financial models, or lab records.
Review these boundary constraints and validation rules before relying on the Economic Order Quantity Calculator output.
Operational scope: EOQ = sqrt(2DS/H). Demand and cost parameters are supplied, stable and positive; the basic model assumes instant replenishment and no shortages, discounts or capacity restrictions. Relevant cost excludes purchase cost. Numeric output uses up to 12 significant digits; floating-point rounding can occur. Inputs that violate minimum/maximum bounds or required format rules are rejected with a clear diagnostic prompt.
Need an adjacent calculation in Everyday Math? Use the related tools linked below to chain your workflow without leaving your browser.
Calculate basic economic production quantity, production-run duration and modeled annual costs.
Open toolCalculate AIC, BIC and the conditional small-sample correction from a supplied log-likelihood.
Open toolSolve one Beer–Lambert quantity from the other supplied values.
Open toolChoose another tool for your next calculation, conversion, or text task.

Find measured edible yield and purchase mass required for a supplied usable target.
Open tool
Calculate saddle-stitch or signature booklet page counts, blank padding pages, duplex sheets, paper weight, and imposition spread order.
Open tool
Calculate salt mass from a supplied water, food and concentration convention.
Open tool
Calculate oil replacement mass using a selected user-supplied ratio.
Open toolAnswers about using Economic Order Quantity Calculator and understanding its results.
The Economic Order Quantity Calculator applies the rule: Calculate basic economic order quantity and annual ordering/holding costs from supplied inputs. Enter Annual demand (units/year), Cost per order, Annual holding cost per unit into the workspace and the tool computes the exact output in your browser.
Yes. Provide Annual demand (units/year), Cost per order, Annual holding cost per unit using the documented units and format shown in the quick reference table above. Preloaded default values let you test the workflow immediately.
EOQ = sqrt(2DS/H). Demand and cost parameters are supplied, stable and positive; the basic model assumes instant replenishment and no shortages, discounts or capacity restrictions. Relevant cost excludes purchase cost. Numeric output uses up to 12 significant digits; floating-point rounding can occur. Confirm that your inputs fall within the allowed ranges before exporting the result.
Yes. All calculations for the Economic Order Quantity Calculator execute 100% locally in your browser's JavaScript runtime. No inputs or results are uploaded to any external server.
Choose another tool for your next calculation, conversion, or text task.